RESPONSIBILITY / COMPLIANCE

TRACEABLE
MATERIALS.
DOCUMENTED
PRODUCTION.

SVETA records the materials, process inputs and approvals that move through a project.

We prefer documented practice to broad environmental claims.

  1. 01Material traceability
  2. 02Process documentation
  3. 03Market requirements
  4. 04Responsible practice
FROM SOURCE TO PROJECT.DOCUMENTATION / WHERE AVAILABLE
MATERIALS HAVE A SOURCE. PROJECTS HAVE A RECORD.RESPONSIBILITY / METHOD

KNOW WHAT
ENTERS THE
PROJECT.

SVETA works with documented sheet-latex sources selected for traceability, consistency and project suitability.

Material information is retained by project where available, including supplier reference, thickness, colour, finish, batch or lot information, source documentation and project use.

  1. 01Source
  2. 02Material
  3. 03Batch
  4. 04Project
  5. 05Record
Supplier
Manufacturer / source
Material
Reference / thickness / colour / finish
Traceability
Batch / lot / available origin data
Project
Material use / production record

DOCUMENT
THE PROCESS
INPUTS.

For applicable sheet-latex construction, SVETA currently uses Bostik 3851 as a documented professional adhesive system.

Applicable supplier, technical and safety documentation is retained for production reference. Specifications may change where a project requires a different construction route.

Adhesive system
Bostik 3851
Documentation
SDS / technical data / supplier record
Application
Project-specific
Status
Documented

COMPLIANCE IS
PROJECT-
SPECIFIC.

Product requirements vary by material, construction, destination market and supply-chain role.

Where destination-market documentation is required, SVETA reviews available material declarations, supplier records and relevant product information before production.

EU / EEA

SUBSTANCE
INFORMATION.

  • REACH / SVHC review
  • Article information
  • Supplier documentation
Official reference ↗
NATURAL RUBBER

SOURCE
TRACEABILITY.

  • Supply-chain information
  • Available origin data
  • EUDR-related review where applicable
Official reference ↗
OTHER MARKETS

DESTINATION
REVIEW.

  • Project-specific requirements
  • Available declarations
  • Client or importer information needs
Discuss requirements ↗

RESPONSIBILITY
IN PRACTICE.

ENVIRONMENT / 01

MATERIAL
TRACEABILITY

  • Project-led production
  • Material use
  • Process-material control

One-off and limited production are aligned with confirmed project demand rather than speculative inventory. Inputs are documented where practical.

PEOPLE / 02

WORKSHOP
PRACTICE

  • Chemical documentation
  • Client privacy
  • Design confidentiality

Technical and safety information is retained where applicable. Client measurements, design files and unreleased materials are handled as project information.

GOVERNANCE / 03

DECISIONS
WITH A RECORD

  • Supplier records
  • Version control
  • Sample approval
  • Claims review

Production decisions are tied to documented project inputs, approved development states and retained material information.

PROJECT
MATERIAL
RECORD.

Traceability becomes useful when it is connected to a specific development and production record.

SVETA / MATERIAL RECORDDOCUMENTATION RETAINED BY PROJECT
Project
SV-XXXX
Sheet latex
Supplier
Material reference
Batch / lot
Thickness
0.40 MM
Colour
Black
Finish
Gloss
Adhesive
Bostik 3851
Documentation
SDS / technical data
Production
Prototype
Approved state
Production

DOCUMENTATION,
NOT BADGES.

Request project documentation
Sheet latex
Supplier / material / batch / available traceability
Adhesive
Bostik 3851 / applicable SDS and technical documentation
Development
Pattern revision / prototype / approval state
Production
Project material record
IP
Confidentiality / portfolio consent
Market
Destination-specific information where applicable

CLAIMS
NEED
EVIDENCE.

SVETA does not describe a garment, material or production process as sustainable, carbon-neutral, zero-waste, non-toxic or universally compliant without evidence supporting the specific claim and its scope.

Where documentation is incomplete, we describe what is known rather than extending the claim beyond the available evidence.

TRACEABLE. DOCUMENTED. SPECIFIC. VERIFIABLE.
PROJECT / DOCUMENTATION

NEED COMPLIANCE
DOCUMENTATION?

Tell us the destination market and project requirements.

Start a project